The Pre-Mortem as Standard Operating Procedure

A premortem is a planning exercise in which a team imagines that its project has already failed and each person writes down why. Run as a standard step at kickoff, it surfaces the risks people know about but do not say, and turns each one into an owner and a mitigation.

A premortem is a planning exercise in which a team imagines that its project has already failed and each person writes down why. Run as a standard step at kickoff, it surfaces the risks people know about but do not say, and turns each one into an owner and a mitigation.

What is a premortem?

A premortem (also written pre-mortem) is a structured meeting held before a project starts, in which the team assumes the project has failed and works backward to explain the failure. Gary Klein introduced it in Harvard Business Review in 2007 as the opposite of a postmortem: the autopsy happens while the patient can still be saved.

Ordinary planning asks how the project will succeed, which invites optimism and makes doubts sound disloyal. The premortem changes the question to why it did fail. Klein grounded the technique in research on prospective hindsight, which found that imagining an outcome as certain helps people explain it more fully than imagining it as merely possible. In practice, the framing gives everyone permission to name the dependency that is already late, the person who is overcommitted, or the integration nobody has tested. Read Klein’s original article, “Performing a Project Premortem”, for the source.

How is a premortem different from a postmortem or a risk register?

A postmortem explains a failure after it happens; a premortem explains an imagined failure while there is still time to prevent it. A risk register lists risks, while a premortem is the meeting that finds the ones the register misses.

Postmortems are honest because the failure is real, and late for the same reason. Risk registers are early, but they are usually written by one person in the optimistic frame of planning, and they collect the risks everyone already agrees on. The premortem borrows the honesty of the postmortem and the timing of the register. Its output feeds the register, and the register then has to change a decision to be worth keeping, a point made in risk registers are theater unless they change decisions.

How do you run a premortem?

The standard procedure has four steps, run in about an hour right after kickoff: set up the failure, brainstorm alone, synthesize as a group, and plan mitigations with owners.

Step 1: Set up the failure

The facilitator states a date shortly after the planned finish and says: the project has failed, clearly and expensively. Make the failure concrete for this project (the launch missed its window, the budget ran out, the main deliverable was not accepted). A vague failure produces vague reasons.

Step 2: Brainstorm alone, in writing

Each person writes every reason they can think of, silently and independently. No discussion yet. Writing alone stops the group anchoring on the first idea spoken and lets junior people contribute without deferring to senior ones. The written lists also become a record the team can return to.

Step 3: Synthesize as a group

Go around the room, one reason per person per turn, until the lists are exhausted. The facilitator captures each reason on a shared board, merges duplicates and clusters related items into themes. The group then marks the themes that are most likely and the ones that would do the most damage; where the two overlap is the priority list.

Step 4: Plan mitigations, with owners

For each priority risk, choose one response: prevent it (change the plan), detect it (add a check or signal that will show it early), or accept it (record the contingency). Every response gets an owner and a date. This is the step that turns the premortem from a worry session into planning. Without it, the meeting produces anxiety; with it, it produces work.

When should a team run a premortem?

Run it once at kickoff for any project whose failure would be expensive, and again at any major replan. Skip it for small, reversible work.

The premortem belongs after the plan exists and before commitments harden: early enough to change scope, staffing or sequence, late enough that there is a concrete plan to attack. It is most useful on cross-team work, on anything with external dependencies, and on projects led by people who are confident, since confidence is what it corrects. Treat it as part of the kickoff template, not a special event, so that holding one never signals that someone expects trouble.

How do you know the premortem is working?

Track two things over several projects: how many of the problems that actually hit were named in the premortem, and how many of those were caught early by the detection steps it created.

If most real problems were on the premortem list, the meeting is finding the right risks. If they were on the list but still arrived as surprises, the mitigations are too weak, usually because they had no owner. If the real problems were not on the list at all, the setup was too abstract or the room was not safe enough to say them. The premortem connects to estimation as epistemology: it is a structured way to ask what the team does not know before the project answers the question for them.